New Lane Shift On US 50 At Trester Hill

There is a switch in the flow of traffic on U.S. 50 eastbound at the Trester Hill construction zone in Aurora.

(Aurora, Ind.) - Road crews are going to close the intersection of Stewart Street at U.S. 50 in Aurora.

Indiana Department of Transportation Southeast District spokesman Harry Maginity says hydroplaning issues during rainfall are forcing crews to switch the lane closure on U.S. 50 Eastbound at Stewart Street from the left lane to the right lane.

Maginity said the lane switch for eastbound traffic may be in effect until that project for resurfacing U.S. 50 at Stewart Street is completed.

An INDOT contractor, Dave O’Mara, continues to repave U.S. 50 between Aurora and Greendale. The $6.9 million resurfacing and slide correction project will continue through the fall of 2019.

RELATED STORIES:

$6.9M US 50 Resurfacing And Repairing Project To Start In April

More from Local News


Events

Crash Turns Fatal Near Sinclair Gas Station in Greendale

The accident took place on Monday afternoon.

One Killed, One Charged with Murder in NKY Shooting

The incident involved two 15-year-olds.

Double First Base Coming to High School Baseball

The change has been approved but won't happen until 2027.

Harrison HS Grad Earns Scholar All-American Status

Gaven Johnson was equally good in the classroom and on the soccer pitch.

Aurora Teen Wins Tiger Trail 5K

The third of six SIRC races was held Saturday in Lawrenceburg.

On Air

Brad Paisley I'm Gonna Miss Her 21:55
Joe Diffie Honky Tonk Attitude 21:48
Lee Brice Memory I Don't Mess With 21:46
Reba McEntire Fancy 21:41